Completed projects

Many years of experience in oversized cargo and transport of project loads

0
Years
experiences
0
Countries
geography of work
0
Containers
per month
0
Cargo
of different weight and volume

Express lumber transport

In this case, the client was very keen on short order execution time. To make this possible, we directed trucks with loads to various border crossings. This way, we minimized the time needed to cross the border. Such projects are always a challenge, but we are happy to undertake them. International road freight is one of our main services.

229f7ce8eaf9e6dff97ef8d3fb555c53-min
73094878bc6b145a7a3d48d16808a98d-min
2c5208c93b2c7c5d1bad78276007ea37-min
Country:
Gwinia
Amount of cargo:
3 pcs
Delivery time:
50 days
Transportation:
roller trailer

Express boat transportation to the United Arab Emirates

One of the services of our company is the delivery of cargo to the UAE. In the case of this particular order, it was a boat that had to be transported to the Emirates in a short time. We started planning this delivery in the last week of 2019. We quickly organized the delivery of the boat to the loading port and made the necessary fastenings. Such loads from Poland to the UAE must of course be transported in containers – in this case it was a flat rack container. Before packing, we secured the load with shrink film. On December 30, 2019, the boat left the port. Despite the short amount of time that we had, we also managed to organize all the documents required for customs clearance of the cargo.

2d27d5402ee0f253b09f773e9f23a258-min
4fa2095fb2438da6449dd260e4a596e7-min
39b3e1f6d95e4eaf36de10e1a7df4cc3-min
75f9dcce97e1deeffdcd7512d6a487a4-min
727aeca8b78b1fd14716bc22fa29100a-min
773e187d020305ffe5e148691c1326f9-min
a3d4e802b7f2297cc4336b3338d330e7-min
a39d6dda7a4ae494bad87e40f4ef8ec7-min
b9f8481f6abfde363c37b9c1cdd520ee-min
Country:
United Arab Emirates
Amount of cargo:
1 FlatRack
Delivery time:
37 days
Transportation:
Flat Rack

Oversized steel cargo

The subject of the order was the transport of cargo from Poland to China – in this case, it was steel semi-finished goods. Since the total weight of the load was 450 tons, we needed specialized container equipment – Roll Trailers to complete the order. The main difficulty was that standard 20 and 40-foot containers do not allow for loading large items, and the specificity of the cargo does not allow filling containers without additional equipment. In this case, the use of roll trailer containers was the perfect solution.
In addition to the challenge of oversized cargo, we also had to implement a transshipment plan in several European hubs and, of course, deliver cargo from Poland to China.

0c3630b9927e57f0f6b36bb51c75aeeb-min
59e1ea03aa4d174b8bb2ffa4fe85dbc6-min
12b09203bd2d8170f202e1bb6aeeabae-min
b401558317fadd1a03b3509a331c52db-min
Country:
China
Amount of cargo:
6 pcs
Delivery time:
45 days
Transportation:
Specialized trailers

Melting furnace

Another project on the list of our achievements was the export of a melting furnace for a steelworks in Guinea. Again, the project was carried out using specialized container equipment – Roll Trailers. Time was of the essence here as well. The biggest challenge was the size of the load – it was 16 meters, which exceeds the maximum length allowed for transport with FlatRack oversized containers. At the same time, the size of the shipment made chartering the whole ship (or a part of it) sailing towards West Africa unprofitable.

However, it wasn’t a challenge we couldn’t deal with – we implemented a logistics plan that included loading the kiln, reloading in several European hubs and direct delivery to the port of Conakry.

51d25d1276335a53f63001ad77a49975-min
8e5ff5d8f5bea9a70db7b2c57d32ee0f-min
942d35d8b4a0d188261ae3651c59d630-min
a66b890364896037e45ad0ce0075b9f1-min
aa8e51a833768401bde5e619fdeffec4-min
b1148364fd81b7aead56f048c1ebd65d-min
c87b2c18e21ef0ff1c5251e285043e62-min
Country:
Gwinia
Amount of cargo:
3 pcs
Delivery time:
50 days
Transportation:
Roller trailer

Equipment from Turkey worth 280,000 euros

The contract involved transporting a specialist machine worth €280,000 from Tuzla (Turkey) to Pavlodar (Kazakhstan). We placed the cargo in two trucks, one of which was designed to transport oversized loads – in this case it weighed 32 tons. To make the delivery of cargo to Turkey financially viable, we decided to ferry the transport across the Caspian Sea from Azerbaijan to Kazakhstan. As a result, the customer saved on the costs of transport services, and the time of the delivery was significantly shortened.

3c981547754a9c101bba3af12ccef803-min
1bffa6be3ff6de61988ac86a2c305ef0-min
1da025666bdf7c2d981732c96cf344bc-min
04bca8a2979c91a152d45180d7fed96f-min
6a4ddd6a273ad1a76f8d6613cf8d6ef8-min
33fc7257929b1bc44f928c05c0a215d8-min
228e8da98cad0c4238d3c17f88af6c9a-min
259acc9b091673dd91b907bdeddf14a6-min
7636f3ca878b3fc62783f3ff6254654f-min
353785ca34f2d662b44bd7841c22a005-min
19056635a0c6a9f2309a2c984eaeb1ea-min
bad9c636a15f16fac7e88309251c7583-min
cec1e7d5f3f07382b0869112c7a7f6d9-min
f7cadc68b477fe2ebda40819ea1908e3 (1)-min
Country:
Pavlodar (Kazakhstan)
Amount of cargo:
-
Delivery time:
-
Transportation:
Specialized truck

Yacht export to Nice

The client commissioned us to export the yacht to Nice (France). The main difficulty here was not the size, which complicated transport and operations at the loading port. The biggest challenges were caused by the period in which the order was carried out – it was a strict quarantine related to the COVID-19 epidemic. Despite this difficulty, we were able to quickly prepare a mounting diagram, load the yacht into a Flat Rack container and pack it in heat-shrinkable foil. Then the cargo was delivered to Marseille, from where it was transported to the bay of Nice.

In addition to the transport itself, we have completed for the client all the documents required for customs clearance of the cargo in the export regime for the individual boat owner, as well as a set of documents for customs clearance in France.

eba543306cefc7df90be5658c365a1a1-min
1e4bdcf5df6d702d118c9612e056deef-min
19ca31ff554783d8cf730379a8cedb9f-min
048c2a15942835aabe552e73f5f2bdfb-min
0138ca065304fa3a3e7d203efbddae8d-min
925ba8f02a9a75977e1343ae7b516042-min
1404e6b21cc2fd649ca987925686b50c-min
70252945e22d0b407943ee1c929f49bc-min
abe05c0a724cb13d47197b62a35e3298-min
af8f851fed9b935088fcbc05e7e619a1-min
cb55e77b3e9b8a845c1467ec686203ad-min
d1caf56fa1dc23e26f2b3c964cd410c1-min
d36dd6578fd445d9df87b9e6f8b63ec0-min
Country:
Nice, France
Amount of cargo:
1 Flat Rack
Delivery time:
45 days
Transportation:
Specialized truck for transporting oversized loads

Transportation of a unique milling machine

Sometimes we have an opportunity to ship really unusual machines. This project was one of those occasions. We were commissioned to transport a milling machine, which after dismantling took as many as 8 vehicles, 2 of which were adapted to transport oversized loads. Since the assembled load is one piece, it has been processed under one customs declaration. Therefore, it was necessary to organize the simultaneous passage of the border and customs clearance by all trucks. The situation was also complicated by the fact that per day only 3 trucks could be loaded. However, we overcame these difficulties and organized the delivery on time. We have also synchronized cargo clearance in such a way that the customer did not have to incur additional costs.

f61e3b6dcd11e19f1450dd153d4d317c-min
9ec2cb9fa876864170e6079708a7d901-min
29d1711333e9d127187c500a7cdc4bdd-min
267e98de196e9ead3d829b0d40c3162a-min
d5209730df68b35642d8e8ee944a1c95-min
f7526702a0a4fc7bb66ccc76acf33859-min
fb162ca916b502ceecab5cce6b47710e-min
Country:
Riga, Latvia
Amount of cargo:
-
Delivery time:
14 days
Transportation:
6 standard trucks and 2 oversize cargo trucks

Export of metal goods (steel bars, metal cylinders)

The client commissioned us to export various metal parts from the largest metallurgical producers to Europe, Asia and America. We carried out the transport by using a container park and bulk carriers. Shipping to the USA, but also to Europe and Asia, always comes with many challenges. International transport of goods in containers is even more difficult for undersized parts. To solve the problem of packing heavy, not palletized loads into containers that are not loaded from the top, we used specialized equipment. All cargo operations were carried out at terminals in the loading port.

f51a8b6eac09d71c712f41c39b62d5fa-min
0c0fd58b2bee44b8bd5aa04584852d0c-min
948a7ca0af857229c723c88c7169ed16-min
6098a75ed1f25d3a291435c55b9eeee1-min
b8a1762daa0682422d2f376596a75ef8-min
Country:
Europe, Asia, America
Amount of cargo:
-
Delivery time:
3-30 days
Transportation:
-

Boat shipping

The main difficulty with this order was the fact that the boat was 3.7 meters wide and 4.6 meters high, which did not allow it to be transported to the port of loading in the standard way. Therefore, we developed an optimal transport route and obtained permits in the shortest possible time, thanks to which it was possible to deliver goods by land. In this case, these were additionally oversized loads. In the time entrusted to us, we made a mounting diagram, the boat was loaded into a Flat Rack container and packed in shrink foil. All documents required for customs clearance of the cargo in the temporary export mode for the individual boat owner have been fully completed.

43096dc2d2678516061f8439dcb73925-min
09ef05da290ba534a3125d6f3676e70c-min
72d3827c52d60cb85654329b0e1d1449-min
990e50a596962682ac0f3cf2d9903121-min
8969106adfefba122baead1ab7c23cc5-min
a2bc16c8b8cb8b48f7b9f17542a60b22-min
b1d15c4c37a936a75a1b30e7c1510169-min
fa37750ecd6b3da2c2d6519fed970e5e-min
Country:
Rijeka (Croatia)
Amount of cargo:
1 Flat Rack
Delivery time:
32 days
Transportation:
Specialized truck for transporting oversized loads

Shipping of equipment for a metallurgical workshop

The project concerned the transport of equipment needed to launch a metallurgical workshop for one of the largest steel companies. The delivery was made from 5 countries – Thailand, China, Indonesia, Italy and Vietnam. Such a large number of countries from different continents required us to synchronize many activities.

For this project we nedded:

  • international transport of goods in containers
  • delivery of goods by land
  • international transport of general cargo
  • sea freight
 

The project included the equipment of three container lines – in total we loaded 71 Flat Rack containers. At the same time, we transported the equipment from Italy without the use of containers, in bulk on board of ship, and then by road to the final destination. The main difficulty was the large number of vehicles involved in the operation and the need to strictly adhere to the schedule for the delivery of equipment to the metallurgical site. However, thanks to a professional plan, we managed to synchronize all activities.

b6618bf708786c2508305252d80d8938-min
bb435ecef873ab1e5c9dc6e6e3712769-min
9d40af692d59c8cf778c3e09269326c0-min
35cbda8bc2a575b351be652321a57d7b-min
187d9554ec30ae6f83ea796684b32f95-min
189e21cae39e20a9d3c8e3940ed5dfa2-min
Country:
Asia, Italy
Amount of cargo:
170 pcs
Delivery time:
70 days
Transportation:
20 Container - 34 pcs.
40 Container - 53 pcs.
40 Flat Rack - 83 pcs.

Shipping of construction loaders

For a building remodeling project, goods had to be delivered from China – in this case construction loaders. Of course, international transport of goods in containers was our only option. Because of this, we needed a large container fleet. Taking into account the seasonal lack of equipment and the tight deadlines set by the client, the transport was carried out using several line carriers.

24e463d185bb0e23821e803d56421d1a-min
907fd4abbb8e0ec9b645526e565c4b72-min
8027f3d0ed234eeb420b2982372ce39b-min
641892041d88c4f5bb41f37facd47e76-min
b15af0690b663acf8bcbd36311a7d47c-min
c76baeb464eca758dfb8145325fe4451-min
d9ac836fffe03cfc485b2c3982d7b808-min
3af603fcbe4dcbf9fa2bf5d4d373a194-min
Country:
China
Amount of cargo:
27
Delivery time:
35 days
Transportation:
20 Container- 15 psc.
40 Container- 12 psc.

Transport of the line for the production of wall thermopanels

The task was commissioned to us by an importer of specialized equipment for the production of wall thermal panels. The main difficulty was that the dismantled equipment required 8 vehicles to transport. In order to reduce the customer’s expenses, we decided to organize the delivery and customs clearance in two stages: in three and then five vehicles.

The first batch delivered some of the equipment under a single customs declaration, while the second batch used methods that also reduced customs clearance costs.

03d47c901b57f043fcabc8af8eb09f2a-min
6ebbcf63650b52d5d3423d3c11cb8ae7-min
19ce5b827c064d20fd3e8ae0bf8f1df8-min
05822a53f8f6019fe8c5e45414b8f93d-min
e8bb7e3dc39df71359fd39d798883ff6-min
e03433dd13dd6cb9e7c6a3e1e4df5696-min
ec306e45e0669b6e4ed5a7bc30ba5a05-min
ee9f837ddea850d1b22d8dd0a6c253b1-min
Country:
Finland
Amount of cargo:
8 trucks
Delivery time:
9 days
Transportation:
Trucks

Export of the mobile inspection complex to Myanmar

Due to the huge weight of the equipment when assembled, the unloading equipment at the destination port could not accept the cargo in its original form. That is why it was necessary to partially disassemble the goods using a container for oversized loads. In order for the container to be transported by sea, it needed to be completely covered in foil.

aebc5bff8cd53311b2e15d58eb379efb-min
3adce6b50d94c894add6c5c67b2a63f0-min
5fd4a5640d1d3b2654d29cf11d80e6d1-min
8a8f5b6482b461a6afae52aaa0344a5c-min
dd4dfc72e5d4dd0d0e1060d790c1d330-min
Country:
Birma
Amount of cargo:
2 pcs
Delivery time:
35 days
Transportation:
20 Container- 1 psc.
40 Flat Rack - 1 psc.

Window production line export

The subject of the order was the export of a metal-plastic window production line to Mexico. We were able to complete the task at an express pace, despite the large amount of equipment, mainly oversized ones. In addition, oversized cargo was packed in wooden crates. Sea freight was handled through several European hubs.

35a7e0b884016b28ce2f2e667b660f10-min
1a68cd470e83aa6bd0229a98b68c0e44-min
7aa542070f4231c96b4f675a9491b509-min
382df48792f4618fac29385fc54e3c33-min
570dfc9ba75b3058251622e66d32553d-min
573d72c118359903769f975762def168-min
b0557beed609983c04a90bb70183a149-min
d9c308bfc7b9bd0162942ccf3d48bdc2-min
Country:
Mexico
Amount of cargo:
17 pcs
Delivery time:
10 days
Transportation:
20 Container - 10 psc.
40 Container - 3 psc.
40 Flat Rack - 4 psc.

Tower crane transport

The order involved the import of a tower crane from China to Kiev for a leading construction company. We completed the task with the use of container equipment, including containers for oversized loads. As time was of the essence, the crane was transported quickly. The most difficult task was the need to clear customs of one of the elements – the tower crane, which was dismantled and arrived in 12 containers. Of course we managed to do that and the crane was in Kiev on the indicated date.

2c8f78449d8325064337a85010aae70c-min
5a81770ca4b4df72f471b999f4b8f84d-min
6bfa9f80c6a85a1074eadd8371b4d733-min
7f6eecddc634fcaf74423c61262e039b-min
384d1828a4d5fc03783bab34cd428d0d-min
591f479dbd4c8b58e786bd10029c389e-min
612a48f92801e31483ccb1c13bfa8a7b-min
d8d857e7322122662e1e336fd513dda6-min
f08dcdc34ce402a244299f08860fbcc5-min
Country:
Kiev
Amount of cargo:
12 pcs
Delivery time:
45 days
Transportation:
40 Container- 10 psc.
40 Flat Rack - 2 psc.